The start of a new year is for many of us a time of reflection. With our tenth calendar year of operation coming to a close (the midway point in the anticipated lifespan of our scheme), Ludlow Hydro Co-operative Chairman, Anthony Shuster, looks back on 2025:
“Following a run of good years in which we have continually proven and boosted our green credentials, 2025 has been a difficult year for hydro-electric production – one of our most challenging to date. Water levels over the past year were exceptionally low for an extended period, meaning we were shut-down for longer than usual. The impact means our hydro-electric generation is forecast to be 45% down on last year. Whilst this is disappointing, we have continued to be proactive, and have used the time to perform vital maintenance work on our hydro infrastructure; partly through necessity and partly as a preventative measure. As such, we approach the new year with quiet optimism that we will see a return to better hydro-electric generation in 2026.”
Our board of directors would like to thank co-op members and interested parties for their continued support for the Ludlow Hydro Co-operative. We wish you all a very happy and prosperous new year.